When it comes to turnaround times for your office signage needs, various factors come into play. Firstly, it depends on the type of signage required and whether we have the necessary materials and media readily available. Additionally, if colour testing is required for your product, it might extend the timeline slightly.

If installation is necessary, the timeline largely depends on your availability for scheduling, any requirements for traffic management, and whether engineers or electricians need to be engaged. Weather conditions can also play a role in external installation schedules.

Fortunately, we’re equipped with multiple machines spread across the country and boast a large, skilled team, ensuring that we seldom face delays due to staff shortages. We often keep multiple media options in stock to reduce turnaround time.

Rest assured, we’re committed to minimising turnaround times as much as possible. Keeping our factory running smoothly and ensuring that our customers’ are happy are our top priorities. Our project managers will keep you in the loop every step of the way.